USS Grand Canyon AD-28

USS Grand Canyon AD-28

The USS Grand Canyon (AD-28) was a Shenandoah-class destroyer tender built during a time of great naval growth and innovation. It was laid down on November 16, 1944, by Todd Pacific Shipyards in Tacoma, Washington, and launched on May 27, 1945. The ship officially joined the U.S. Navy on April 5, 1946, with Captain Charles A. Buchanan at the helm. This ship was part of a larger effort to boost the Navy's ability to support its expanding fleet of destroyers, which were vital during World War II and the Cold War.

Named after the Grand Canyon, a symbol of grandeur and strength, the ship embodied the spirit of its namesake. It was designed to provide essential support and maintenance to the Navy's destroyers, ensuring they were always ready for action. The name carried a sense of pride and duty, reflecting the ship's crucial role in the Navy's operations.

The USS Grand Canyon was like a floating workshop. It had extensive repair facilities, including machine shops, foundries, and electronic repair stations. This made it capable of handling everything from routine maintenance to major overhauls. It also had medical and dental facilities, offering comprehensive support to the crews of the ships it serviced. This versatility made the Grand Canyon an invaluable asset in keeping the Navy's operations running smoothly.

Throughout its service, the USS Grand Canyon was a steadfast supporter of the Navy. It played a key role in various operations, including the Korean War, the Cuban Missile Crisis, and the Vietnam War. Its ability to provide timely and effective maintenance allowed destroyers to stay at sea longer and perform their missions reliably. This was crucial in maintaining the Navy's readiness during times of conflict and tension.

The Shenandoah-class destroyer tenders, like the Grand Canyon, were specifically designed to support and maintain the Navy's destroyers. They provided repair, maintenance, and logistical support, ensuring destroyers were always combat-ready. These ships were equipped with advanced repair facilities and a skilled crew, essential for extending the operational life of destroyers.

Commissioned on April 5, 1946, the USS Grand Canyon quickly became a key part of the Navy's support fleet. Its commissioning marked the start of a distinguished career that spanned several decades and numerous conflicts. The ship's ability to provide comprehensive and timely repairs ensured that destroyers could continue their missions without long downtimes, significantly boosting the Navy's operational capabilities. The USS Grand Canyon's service was a testament to the Navy's dedication to maintaining a strong and effective fleet, ready to face the challenges of a changing world.

 

USS GRAND CANYON AD-28 Framed Navy Ship Display
USS GRAND CANYON AD-28 FRAMED NAVY SHIP DISPLAY

USS Grand Canyon AD-28: Structure, Technology, Armament, and Weaponry

The USS Grand Canyon (AD-28) was a Shenandoah-class destroyer tender, a ship built to keep destroyers in fighting shape. It was a big, sturdy vessel, stretching 492 feet long with a beam of 69 feet 6 inches. When fully loaded, it displaced about 16,500 tons. This size allowed it to carry all the repair facilities, machine shops, and spare parts needed to keep a fleet running smoothly. Made from high-tensile steel, the hull was tough enough to handle the rough seas. Inside, the ship was a hive of activity, with decks dedicated to repairs, crew quarters, and command operations.

The USS Grand Canyon was packed with cutting-edge tech for its time. It had machine shops that could whip up parts on the spot, electrical repair stations, and gear for fixing hulls and structures. Diagnostic tools were on hand to figure out what was wrong with the destroyers it serviced. The ship's steam turbines powered all this equipment, keeping everything running smoothly. Communication was key, and the ship had advanced systems to stay in touch with the fleet and coordinate repairs efficiently.

Though not a combat ship, the USS Grand Canyon was ready to defend itself. It had two 5-inch/38 caliber dual-purpose guns that could take on both surface and air threats. These guns were mounted on the deck, ready to spring into action. The ship also had several 40mm Bofors anti-aircraft guns and 20mm Oerlikon cannons, providing a layered defense against enemy aircraft and smaller vessels. This weaponry ensured the ship could protect itself while doing its crucial support work.

Beyond its guns, the USS Grand Canyon had other defensive tricks up its sleeve. Radar and sonar systems helped spot incoming threats, giving the ship a chance to act first. Electronic countermeasures were in place to mess with enemy targeting and communications. While its main job was maintenance and logistics, these defenses meant the USS Grand Canyon could safely operate in dangerous waters, keeping the fleet it served ready for action.

 

USS Grand Canyon AD-28 Navy Ship Plaque
USS Grand Canyon AD-28 Personalized Plaque

Crew Accounts of Time Aboard

The USS Grand Canyon (AD-28) holds a treasure trove of memories for its former crew members, each recounting their unique experiences aboard the ship. These recollections span from the early 1950s to the late 1970s, painting a vivid picture of life on this distinguished vessel.

Richard Aldrich, who served in 1950 as a Seaman (SN), fondly remembers learning from the best, specifically BM1 Keith and BM1 Everett. Their guidance set him on the right track for a 27-year stint in the Navy, and he enjoyed every day aboard what he considered one of the better ships.

James Debney, a Shipfitter Pipe Second Class (SFPS) in 1962, recalls those years as some of the best of his life. He reminisces about two Mediterranean cruises, visits to Penney's Bar in Old San Juan, and stops in Guantanamo Bay, France, and Spain.

David Duane, an Electronics Technician (ETN) in 1967, vividly remembers a harrowing storm they encountered while returning from Naples. He spent his time in the Combat Information Center (CIC) watching the roll indicator, fearing for their lives.

Lenny Dubois, an Electrician's Mate Second Class (EM2) in 1962, is keen on reconnecting with former shipmates through yearly reunions, which he describes as well-planned and lots of fun.

James Ellis, who served as an E-3 in 1977, worked in the boiler repair shop and had a great time. He recalls a particular incident when the ship went to sea, and he and some mates took leave for five days, only to be towed back to port.

Paul Giacomo, a Boiler Technician Third Class (BT3) in 1965, worked long days in the R2 division's boiler repair shop but enjoyed good times. He also remembers the storm they hit while returning from the Mediterranean in 1968.

David Jones, a Seaman (SN) in 1966, is looking to reconnect with shipmates from the deck crew's 2nd division. He currently resides in Tampa, FL, and is interested in finding a yearbook with photos of his shipmates.

Frank Rose, who served as an E-3 in 1971, is searching for any shipmates who worked in the foundry. He had a great time in his shop and with the guys he worked with.

Charles Schambach, an Electrician's Mate Third Class (EM3) in 1963, recalls the Cuban Crisis and a memorable incident involving Butch Topitz getting his ass wet during a highline transfer in the North Atlantic's high seas.

Robert Shafer, who served as an E-3 in 1965, was the ship's barber during the 1966 Mediterranean cruise. He is looking for a buddy, Paul Winningham from Oklahoma, and currently lives in Ohio.

Verdell Beier, a Torpedoman's Mate Second Class (TM2) in 1966, had a great tour of duty with an outstanding torpedo shop crew. He fondly remembers shipmates Jim, Eugene, Pete, Jerry, Glen, Fred, Vic, Yogie, and Tex, the oldest rate grabber in the Navy.

Bill Blazina, an Electronics Technician First Class (ET1) in 1968, recalls a cruise to Scotland and Amsterdam, which was a lot of fun. He also remembers a Mediterranean cruise in 1969 to Malta and Naples, and the many friends he made aboard the ship.

Steve Lemanowicz, a Machinery Repairman Third Class (MR3) in 1977, had his first command out of 'A' school on the USS Grand Canyon. He learned his trade in the machine shop, made many friendships, and was part of the decommissioning crew.

Pete Motley, a Torpedoman's Mate Third Class (TM3) in 1965, is looking for Jerry Dale Hale, a TM2 who served with him and would be around 70 years old now.

Ron Schmidt, a Machinist's Mate Third Class (MM3) in 1967, started his tour in Naples, Italy. He worked in the Valve Shop and later in Outside Repair. Having transferred from a carrier, he found the camaraderie on the USS Grand Canyon to be exceptional from the start.

Gary Seyler, a Machinist's Mate Fireman (MMFM) in 1959, retired from Pennsylvania Electric after 30 years. He had a long career in the power industry, working his way up from the basement to the control room, finishing in Stores and Transportation when the power station closed down.

These memories collectively highlight the camaraderie, adventures, and challenges faced by the crew of the USS Grand Canyon (AD-28), creating a rich tapestry of naval history and personal experiences.

 

USS Grand Canyon AD-28 Coffee Mug
USS Grand Canyon AD-28 Coffee Mug

USS Grand Canyon AD-28: Upgrades, Mission Capabilities, and Contribution to the Fleet

The USS Grand Canyon (AD-28) was a remarkable ship that served the U.S. Navy with distinction. Commissioned in 1946, it was a destroyer tender, equipped with top-notch repair facilities like machine shops, foundries, and electronic repair stations. Over time, as technology evolved, the Grand Canyon got several upgrades. In the 1960s, it received improved radar and communication systems, which helped it coordinate better with other ships and shore operations. These enhancements kept the Grand Canyon ready to meet the changing demands of naval warfare.

The ship's mission was all about support. As a destroyer tender, it provided maintenance and logistical support to destroyers and smaller vessels. It could handle engine repairs, hull maintenance, and even supply provisions and medical services. Think of it as a floating repair yard, capable of complex overhauls and emergency repairs at sea. This was crucial during long deployments, allowing the fleet to stay operational without heading back to port.

The USS Grand Canyon made significant contributions during conflicts. In the Korean War, it was vital in keeping destroyers combat-ready, performing quick repairs and supplying essential materials. During the Vietnam War, it provided crucial support to naval forces, enabling them to operate in the tough conditions of Southeast Asia. The ship's role in these conflicts highlighted its strategic importance to the Navy's success.

But it wasn't just about wartime. In peacetime, the Grand Canyon was key in training exercises and fleet operations. It showed off its capabilities and trained new sailors in repair and maintenance, ensuring the fleet's readiness. This fostered a culture of excellence and preparedness in the Navy. The legacy of the USS Grand Canyon is one of steadfast support and adaptability, leaving a lasting mark on the Navy's operational effectiveness.

 

Framed Navy Discharge Certificate
Framed Navy Honorable Discharge Certificate

USS Grand Canyon AD-28: Deployments, Role in Major Conflicts, Awards, and Commendations

The USS Grand Canyon (AD-28) was a powerhouse in keeping the U.S. Navy's fleet ready for action. Commissioned in 1946, this ship was all about maintenance and repair, making sure other vessels stayed combat-ready. It traveled to key spots like the Mediterranean, the Atlantic, and the Caribbean. These trips were vital for maintaining a strong naval presence and ensuring the fleet could jump into action when needed.

During the Korean War, the Grand Canyon was a lifeline for the United Nations' naval forces. Its repair skills were in high demand, fixing up destroyers, cruisers, and more. The crew worked around the clock to get damaged ships back into the fight, playing a crucial role in the naval blockade and bombardment operations. This period highlighted just how important support ships are in modern warfare.

The ship didn't stop there. In the Vietnam War, the Grand Canyon was deployed to the Western Pacific, backing up the Seventh Fleet. It was a busy time, with the ship providing essential repairs to keep the fleet going strong. This support was key for naval bombardments, amphibious assaults, and other missions. The Grand Canyon's quick and complex repairs kept the fleet's operations running smoothly and effectively.

The USS Grand Canyon's hard work didn't go unnoticed. Over the years, it racked up numerous awards and commendations, like the Navy Meritorious Unit Commendation and campaign medals for Korea and Vietnam. These honors show just how much the ship contributed to the Navy's mission. The legacy of the USS Grand Canyon AD-28 is one of unwavering support, technical skill, and a steadfast commitment to defending the United States and its allies.

 

Framed and Engraved Military Aircraft Displays
Framed and Engraved Military Aircraft Displays

USS Grand Canyon AD-28 Ship Specifications

Specification Details
Class Shenandoah Class
Destroyer Tender
Commissioned April 6, 1946
Displacement 11,944 tons
Length 492 feet
Beam 69.5 feet
Draft 24.4 feet
Speed 18 knots
Complement 1,035
Back to blog

Leave a comment

Please note, comments need to be approved before they are published.